Uthuru Janani Power Station | |
---|---|
Country | |
Location | |
Coordinates | 9°44′27″N 80°02′00″E / 9.7408°N 80.0333°E |
Status | Operational |
Construction began |
|
Commission date |
|
Construction cost |
|
Thermal power station | |
Primary fuel | |
Feed-in tariff |
|
Power generation | |
Units operational | 3 × 8 MW |
Make and model | Unknown (3) |
Nameplate capacity |
|
Annual net output |
|
The Uthuru Janani Power Station (also sometimes called the New Chunnakam Power Station, as it is the replacement of the former Chunnakam Power Station) is a 24-megawatt thermal power station commissioned on 1 January 2013, in Chunnakam, Sri Lanka. The power station consists of three diesel-run generating units with a capacity of 8 MW each, producing 176 GWh annually. Built and operated by the Ceylon Electricity Board for Rs. 3.5 billion, the power station costs Rs. 17.86 to generate one unit (1 KWh) of electricity.[1][2]
The plant is built approximately 300 m (980 ft) north-west of the 36 MW privately owned Northern Power Station, and was ceremonially opened by former President Mahinda Rajapaksa. The facility also consists of in-house refinery, fuel storage, and waste disposal system.[3]