INS Vikrant under construction.
| |
Class overview | |
---|---|
Name | Vikrant-class aircraft carrier |
Builders | Cochin Shipyard Limited |
Operators | Indian Navy |
Preceded by | INS Vikramaditya |
Succeeded by | INS Vishal |
In service | 2022–present |
Planned | 2[1][2][3] |
Completed | 1 |
Active | 1 |
General characteristics | |
Type | Aircraft carrier |
Displacement | 40,000 t (39,000 long tons) |
Length | 262 m (859 ft 7 in) |
Beam | 62 m (203 ft 5 in) |
Draught | 8.4 m (27 ft 7 in) |
Depth | 25.6 m (84 ft 0 in) |
Decks | 2.5 acres (110,000 sq ft; 10,000 m2) |
Propulsion |
|
Speed | 28 kn (52 km/h) |
Range | 8,000 nmi (15,000 km)[4] |
Complement | 1,400 (incl air crew) |
Sensors and processing systems |
|
Electronic warfare & decoys | C/D band early air-warning radar[4] |
Armament | |
Aircraft carried |
|
The Vikrant class (formerly Project 71 Air Defence Ship (ADS) or Indigenous Aircraft Carrier (IAC)) is a class of aircraft carrier being built for the Indian Navy. The class represents the largest warships and the first aircraft carriers to be designed and built in India.
Preparations for building the lead vessel of the class, INS Vikrant, started in 2008, and the keel was laid in February 2009. The carrier was floated out of its dry dock on 29 December 2011,[7] launched on 12 August 2013 and commissioned on 2 September 2022.[8] [9] The scale and complexity of the project caused problems which delayed the commencement and timeline of construction for the carrier. Technical difficulties, the cost of refitting the Russian-built carrier INS Vikramaditya, and billions in cost overruns[10] delayed plans for the first of the vessels to enter service.[11]
DN449
was invoked but never defined (see the help page).