West Coast MRT station

 CR18 
West Coast
西海岸[1]
வெஸ்ட் கோஸ்ட்[2]
Future Mass Rapid Transit (MRT) station
Artist's impression of West Coast MRT station
General information
Location301 West Coast Road
Coordinates1°18′39″N 103°45′28″E / 1.310790°N 103.757828°E / 1.310790; 103.757828
Owned byLand Transport Authority
Line(s)
Construction
Structure typeUnderground
AccessibleYes
History
Opening2032; 8 years' time (2032)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
Clementi Cross Island Line
Future service
Jurong Lake District
Terminus
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
West Coast
West Coast station in Singapore

West Coast MRT station is a future underground Mass Rapid Transit station on the Cross Island line (CRL) located in Clementi, Singapore. It will serve West Coast Road, West Coast Highway and West Coast Drive. First announced in September 2022, the station is expected to be completed in 2032 along with the other CRL Phase 2 stations.[3]

  1. ^ "跨岛线第二阶段将有六个地铁站 预计2032年竣工". 早报 (in Chinese). 20 September 2022. Archived from the original on 21 September 2022. Retrieved 20 September 2022.
  2. ^ "குறுக்குத் தீவு ரயில்பாதையின் 2ஆம் கட்டம் 2032ல் திறப்பு". tamilmurasu (in Tamil). 21 September 2022. Archived from the original on 21 September 2022. Retrieved 21 September 2022.
  3. ^ "Cross Island Line Phase 2". LTA. 20 September 2022. Archived from the original on 20 September 2022. Retrieved 20 September 2022.