Western Power Corridor

The Western Power Corridor (Westcor) was a project to construct and supply energy from two hydroelectric power plants to the Democratic Republic of the Congo, Angola, Namibia, Botswana and South Africa. Originally, the hydro power was to be supplied form the Democratic Republic of the Congo's INGA III project. Later Inga III was supposed to be replaced by Angola's Cuanza River and Cunene River projects or by the new project in the Democratic Republic of Congo.[1][2]

  1. ^ "Westcor pulls out of Inga III power project". PanaPress. 2009-08-13. Retrieved 2010-10-23.
  2. ^ Njini, Felix (2010-10-15). "SADC in bid to revive Westcor". The Southern Times. Retrieved 2010-10-23.