Winsor Dam

Winsor Dam
Winsor Dam on the Quabbin
Official nameWinsor Dam
LocationWare / Belchertown, Massachusetts, USA
Coordinates42°16′59″N 72°20′36″W / 42.28306°N 72.34333°W / 42.28306; -72.34333
Construction began1935
Opening date1939
Operator(s)MWRA
Dam and spillways
ImpoundsSwift River
Height295 ft (90 m)
Length2,640 ft (805 m)
Width (base)1100 ft (335 m)
Reservoir
CreatesQuabbin Reservoir

The Winsor Dam and the Goodnough Dike impound the waters of the Swift River and the Ware River Diversion forming the Quabbin Reservoir, the largest water body in Massachusetts. According to the Massachusetts Department of Conservation and Recreation the Winsor Dam is one of the largest dams in the Eastern U.S. The Winsor Dam is part of the Chicopee River Watershed. The Winsor Dam was named for Frank E. Winsor, its chief engineer.[1]