General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Yuqiao Road (御桥路) and Yuqing Road (御青路) Beicai, Pudong New Area, Shanghai China | |||||||||||||||
Coordinates | 31°09′37″N 121°34′01″E / 31.160350°N 121.566816°E | |||||||||||||||
Operated by | Shanghai No. 2 Metro Operation Co. Ltd. (Line 11) Shanghai Maglev Development Company (Line 18) | |||||||||||||||
Line(s) | Line 11 Line 18 | |||||||||||||||
Platforms | 4 (1 island platform and 2 side platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | 31 August 2013 (Line 11) 26 December 2020 (Line 18) | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Yuqiao (simplified Chinese: 御桥; traditional Chinese: 御橋; pinyin: Yùqiáo) is a Shanghai Metro interchange station in Pudong, Shanghai, located at the intersection of Yuqiao Road and Yuqing Road in Beicai town. It is served by Lines 11 and 18. The station opened as part of Line 11's phase 2 extension on August 31, 2013.[1] It became an interchange station with Line 18 when the southern portion of phase 1 of that line opened on 26 December 2020.[2] It served as the northern terminus of Line 18, which consists of eight stations between Yuqiao and Hangtou, until the line was further extended northward to South Changjiang Road on December 30, 2021.[3][4][5]
On Line 11, the next station to the east is Luoshan Road. To the west, the next station is Kangheng Road. On Line 18, the next station to the south is Kangqiao. To the north, the next station is Lianxi Road.